Whether public programmes (Manufacturing AI Innovation, AI Voucher) apply is reviewed in the consultation · eligibility and limits follow each notice

See funding terms
Skip to content

Light consulting — DARVIO diagnosis + remote review

We connect to your existing systems read-only and findwithin one to two weeks where cost is leaking

Share connection details online — DARVIO AI runs the diagnosis,
and a consultant verifies the result into an evidence-backed report.

KRW 9.9M (excl. VAT) · 1–2 weeks · online · One plant, one cost process, up to three data sources

Who it fits

If this sounds like you, Light is the right one

  • You have an MES or ERP, but the data doesn’t reach your decisions
  • Finding the cause depends on one particular veteran
  • You want a fast read without consultants coming on site

Need a deeper look?

There is a route where consultants come on site and, through interviews, observation and data checks, produce
a single document.

See Standard consulting

What Light consulting does

It runs in four stages

  1. 01Context

    Reading the floor

    We go through the process flow and the data you already have, and map your documents and system structure.

    Deliverable:Floor workflow map
  2. 02Connect

    Connecting the data

    We join process data (MES) to management data (ERP), and find what’s missing.

    Deliverable:Integrated data mapping document
  3. 03Discover

    AI narrows down likely causes

    We follow the structure of the process data to hidden causes, and convert the loss into money.

    Deliverable:Evidence-based problem statement, loss assessment
  4. 04Design

    Designing the route

    We set out the improvement route and the range of effect to expect.

    Deliverable:Improvement route design, expected effect

Deliverables

This is what the diagnostic leaves you with

  • Plant diagnostic report

    Your plant’s core problem laid out structurally, with the causal chain on one page.

  • Loss assessment

    The losses found, quantified, so the case for investment is something you can hold.

  • PoC proposal (with expected effect)

    A concrete route to improvement and what to expect from it, so you can judge whether to go into a PoC.

Sample report

The first page of a Light report

The company and every figure are fictional. A real report follows your scope and data.

DARVIO cost-loss diagnostic report

Fictional manufacturer C · Plant 2 · two-week diagnostic · Light consulting

Fictional

Over the last six months, unexplained cost variance averaged KRW 180M a month. KRW 120M of it comes from the three causes below.

CauseDetailPer monthStatus
Material prices not updatedQuote prices for the top four materials unchanged for seven monthsKRW 51MConfirmed
Lot variance in material BMix quantity exceeded in one supplier’s lotsKRW 42MTo check
Slow-moving SKU stockThree SKUs over 68 days of stockKRW 27MConfirmed

Next steps

  • Set rules for updating the price master (cost-management PoC candidate)
  • Re-check the lot variance once quality data is in
  • Agree with sales what to do with the three SKUs

FAQ

Frequently asked questions

Light consulting · 1–2 weeks

Where it leaks, pinned down in 1–2 weeks

The 30-minute intro call is free. Light consulting is KRW 9.9M (excl. VAT) and runs online over 1–2 weeks. If you go on to a PoC, the full Light fee is credited against it.

Read the AX kickoff guide