DARVIS-QQuality OS · QualityStatus In build · results not yet measured

See the defective lot’s process record next to similar past cases, then draft the fix

DARVIS-Q joins process, equipment and inspection data with quality documents, narrows down the candidate causes, and drafts a corrective action from past records. The quality lead makes the call and confirms the action.

60-second demo

The conditions behind the defect, next to similar cases from the past.

Tie inspection results and process records to one lot and find the abnormal stretch

DARVIS-QFictional Parts Co. · press line 2
As of 2026-06-13 10:30 · MES · QMS read-onlyRead-onlyFictional data
Defects

Line 2 · Lot L-0613-04 · bracket BR-210

The lot’s inspection report and process records side by side.

EquipmentPress P-02PartBR-210 (fictional)Period13 Jun morning

Inspection report

ItemSpecMeasuredResult
Outer diameter (mm)20.00 ± 0.0520.03Pass
Thickness (mm)2.00 ± 0.052.08Fail
SurfaceNo scratchesNone foundPass

Process record · every 15 min

TimeDie temp (°C)Pressure (MPa)
09:001823.1
09:151843.2
09:301913.6
09:451833.1

Die temperature and pressure left the usual range from 09:25 to 09:40.

By lotInspection and process together
Past actionsSimilar cases with evidence
A draft fixThe quality lead confirms

Process records, inspection results and past corrective actions in one place, through to a draft fix.

In the consultation we decide which line and defect type to connect

The loss it prevents
Defects that repeat because the cause is never found, and the stoppages they bring
The question on the floor
A defect appeared. Was it the material, the process conditions or the equipment?
Status
In build · results not yet measuredIt is being built at a customer site. Results there have not been measured yet.

Figures from defect-case analysis

These come from defect-case analysis. Results at the customer where it is being built have not been measured yet and will be published separately.

Time to find the defect cause
72 h → 3 min
Defect rate improvement
85%
Production-stoppage loss saved
90%

What you prepare

  • One read-only connection (MES, QMS)
  • A set of defect reports and corrective-action records
  • Two or three interviews

What it does not do

  • Control equipment
  • Automatic pass/fail decisions
  • AI auto-approval

Existing MES and QMS systems are connected read-only, with on-premise and closed-network options.

One line · one defect type to start

DARVIO diagnostic consulting

In the consultation we decide which line and defect type to connect