Skip to content

DARVIS-PProfit OS · Cost and marginStatus Live

Find the anomaly that will become a loss earlier, follow it to the cause, and decide what to change.

The AI tracks anomalies and drafts an action with an amount on each cause; people approve or hold. It only reads existing systems, and if part of the change cannot be explained, that month is not published.

60-second demo

Is there an anomaly to catch this month before it becomes a loss?

Where did the change from the usual range begin? Three anomalies this morning

DARVIS-PFictional Manufacturer · Plant 1
As of 2026-06-13 07:00 · ERP · MES read-onlyRead-onlyFictional data
Anomalies

Month to date · 1 – 13 Jun

Only signals outside the usual range come up. Other items can be reviewed when needed.

CompanyFictional ManufacturerPlantPlant 1Period2026-06 to dateBasisUsual range · last 12 weeks

Where the anomaly appears

Cost+4.3%pFrozen-food cost ratio
MarginUsual range
Inventory19.5 daysCentre B · SKU-118
YieldUsual range
DefectsUsual range
DeliveryUsual range
3 anomalies · click a row to go down to the cause
DetectedSignalWhereUsual → nowNext lock-inStatus
13 JunCost ratio +4.3%pFrozen food · material S-04264.1%68.4%Quote 25 Jun D-12Check cause ›
12 JunInventory 19.5 daysCentre B · SKU-1184–7 days19.5 daysDisposal 20 Jun D-7Review transfer ›
10 JunPurchase price +15.2%S-042 · supplier KLast-month avg+15.2%Order 18 Jun D-5Alternative quote ›
Before it locks inWhen the anomaly is known
Cause and evidenceSeen in one screen
Connected itemsFull review coverage

Change it before the next quote or purchase order, and it does not become a locked-in loss.

In the consultation we decide where to start on your cost data

Fictional quote example · EX-Q1

Same quantity, a KRW 2.4M material-cost difference

Check the cost difference before your next quote or purchase order.

Material-cost calculation for the same planned quantity: 8,000kg
Price inputUnit price × planned quantityMaterial cost
Material cost in sales quoteKRW 2,400/kg × 8,000kgKRW 19.2M
Recent priceKRW 2,700/kg × 8,000kgKRW 21.6M
DifferenceKRW 300/kg × 8,000kgKRW 2.4M

This details the same fictional EX-Q1 quote shown on the homepage, with data separate from the walkthrough above. The material-cost difference at the same planned quantity is not a customer’s realised loss or savings.

Start where it leaks

Find where the change from the usual range began.

Why the total reconciles

Go down through product, material, process and supplier.

A month not published

If an unexplained share remains, the result is not published that month.

People approve

It leads to purchasing, quoting, reallocation and inspection, but people execute and approve.

The starting point is a problem we have already handled, such as a cost swing. Inventory is DARVIS-I, quality is DARVIS-Q.

What you prepare

  • One read-only connection
  • Two or three interviews
  • Three to six months of close data

What it does not do

  • Write to ERP
  • Predict
  • Take automatic action
  • AI auto-approval

Existing ERP and MES systems are connected read-only, with on-premise and closed-network options.

25+
Clients in paid builds, R&D, PoCs (Sep 2026)
7
Industries
Passed
Government agency security review
Read-only
Existing ERP · MES integration
“It explains why Product A’s cost changed last month, with the comparison, contribution of each change and supporting evidence in one answer.”
Cost team at a large food manufacturer

One plant · one loss area · 4–6 weeks

DARVIO diagnostic consulting

In the consultation we decide where to start on your cost data