Skip to content

Construction and plant

What the last site solved, this site never hears about

Drawings, specifications and site records accumulate per project. When the project closes, the judgement inside it closes with it.

What we hear again and again here

  • Every project starts from zero

    The same method hits the same problem again, and rechecking is faster than finding what the last site wrote down.

  • Drawings and documents live apart

    Drawings in one place, specifications in a folder, change history in email. Lining them up is manual work.

  • Safety and quality evidence is gathered in a rush

    When an inspection or an incident needs the standard and its history, the first task is finding where anything is.

What we do

  • Search across projects, not inside one

    Drawings, specifications and review records from earlier sites come back to one question.

  • Bring up a standard with its basis

    Answers arrive with the clause they came from. Never the answer without the source.

  • Leave as-built records the next site can use

    Records from a finished site are organised into something searchable.

What we usually connect

PMISERPCAD · BIM 도면시방서 · 기술 문서안전관리 시스템협력사 제출 자료

We connect read-only. Nothing is written back, and nothing gets restarted.

Common questions

  • Site connectivity is unreliable — is that a problem?

    The default is to host at head office and let sites query it. If a closed network is required, we install on-premise.

  • Can subcontractor documents go in?

    They can. Deciding who may see which document comes first, though.

We work out where to start, together

We start by finding what people keep looking for. What to connect, and by when, follows from that.